General election · 3 November 2026

State House, District 15

4 candidates on the ballot, listed in certified ballot order.

Race type
Contested
Candidates
4
Surveys returned
2 of 4
Race receipts
$20,733

Andre Zachariahs

Not a sitting legislator

RepublicanBallot order 1

Where they stand on data centers

Nothing on record.Andre has never held legislative office, so there are no roll calls to score.

Survey: no response recorded

With no voting record and no returned questionnaire, this page has nothing from them on data centers. Voters have no stated position to weigh.

Ask them to answer

Money — a signal, never a position

$440Total receipts reported
Matched a flag (A–D)

No itemized donors filed. That is not the same as having raised nothing.

Committee: Andre For House.

A flag means a donor matched a category. It is not a finding that anything improper happened.

How to reach them

Share this card

Joni Tschetter

Not a sitting legislator

RepublicanBallot order 2

Where they stand on data centers

Nothing on record.Joni has never held legislative office, so there are no roll calls to score.

Survey: responded

Hyperscale data centers can cause major problems not only to the land, but the people and wildlife that live in the vicinity of them. Water pollution: Alarms have been raised in many areas of not only public water supplies being contaminated like in Cheyenne WY, but also in the streams and rivers close to the hyperscale data centers. PFAS contamination is not easily mitigated and is extremely detrimental to health. Noise pollution: The constant noise of the hyperscale data center is disturbing for humans. Not only can the high noise levels cause sleep deprivation, but the low frequency noise can provide physical discomfort to humans and wildlife. Environment: In South Dakota, we have prime farmland/pasture. The farmland and pastures are necessary for America's food stability and for its economy. Other issues that also have been reported and are still being researched are: Massive water consumption vs. the needs of nearby residents High Energy demand and how it affects the electric bills of nearby residents The effects of the noise pollution on farm animals Potential inability of resale and/or loss of property values of homeowners in the vicinity of hyperscale data centers Much information has been written about the above situations that arise from Hyperscale data centers. These issues can cause a decrease in quality of life and sometimes are irreversible. I believe until we have concrete answers and sound solutions for these concerns, we should have a moratorium on the Hyperscale data centers here in South Dakota.
Published verbatim as submitted

Money — a signal, never a position

$9,490Total receipts reported
Matched a flag (A–D)

No itemized donors filed. That is not the same as having raised nothing.

Committee: Joni For District 15.

A flag means a donor matched a category. It is not a finding that anything improper happened.

How to reach them

Share this card

Kadyn Wittman

Kadyn Wittman

Sitting legislator

DemocratBallot order 3

Where they stand on data centers

67%protective votes — 2 of 3 tracked roll calls

Split record

Survey: responded

The biggest concern I hear is that people feel decisions are being made behind closed doors while local communities are expected to absorb the impacts. South Dakotans are asking: How much water and electricity will these facilities consume? Will local residents end up paying higher utility costs? Are taxpayers subsidizing billion-dollar corporations without seeing meaningful long-term benefits? What happens to farmland, roads, and local infrastructure? How much local control do communities actually have once deals are negotiated? There’s also frustration that the public often learns about these projects after major agreements are already in motion. People are not anti-technology, but they are tired of feeling like ordinary citizens get less information than corporate developers. And frankly, many people are skeptical of promises about jobs. A hyperscale data center can require massive public infrastructure investment while creating relatively few permanent positions compared to other industries.
First, I believe transparency has to come before incentives. If a corporation wants public support, tax breaks, utility partnerships, or local approvals, the public deserves clear information upfront, including projected energy demand, water usage, tax agreements, and infrastructure impacts. Second, local communities need real authority in the process. Rural residents should not feel steamrolled because state leaders are chasing ribbon cuttings or press releases. Third, I think South Dakota needs stronger safeguards to make sure residents are not subsidizing private profit. That means carefully reviewing utility cost shifts, protecting groundwater resources, and ensuring companies contribute fairly to the infrastructure they depend on. I’m not opposed to data centers. They may absolutely have a place in South Dakota’s economy. But I do not believe economic development should mean blank checks, secrecy, or asking local communities to simply “trust the process.” Good policy requires balance: welcoming innovation while protecting taxpayers, natural resources, and public trust.
Published verbatim as submitted

Money — a signal, never a position

$9,663Total receipts reported
$1,000Matched a flag (A–D)
  • DIndividuals named in the investigation$1,000

Flagged donors on recordMatthew Paulson $1,000 [D]

Committee: Wittman For House.

A flag means a donor matched a category. It is not a finding that anything improper happened.

How to reach them

Share this card

June CopperStad

Not a sitting legislator

DemocratBallot order 4

Where they stand on data centers

Nothing on record.June has never held legislative office, so there are no roll calls to score.

Survey: no response recorded

With no voting record and no returned questionnaire, this page has nothing from them on data centers. Voters have no stated position to weigh.

Money — a signal, never a position

$1,140Total receipts reported
Matched a flag (A–D)

No itemized donors filed. That is not the same as having raised nothing.

Committee: June For South Dakota.

A flag means a donor matched a category. It is not a finding that anything improper happened.

Share this card

What the flags mean

A · Data center and Big Tech
The industry itself, its lobbyists, and the trade group that testified for the 50-year tax break.
B · Utility, power and energy
Utilities, generators, transmission and the ethanol bloc — interests whose revenue rises with data center load.
C · The PAC funnel
Money arriving through a political action committee rather than directly.
D · Named individuals
People named in the underlying investigation.
E and F · Outside money
Large national spending and independent expenditure made for a candidate. Never the candidate’s own money, and never added to their receipts.

How the score is built

Roll calls on 2026 data center bills are tracked. A vote counts as protective when it sided with residents on cost, water, or local control.

Candidates with no legislative service have no score. That is shown as an absence, never as a zero.

Full roll calls and bill text: the legislative scorecard.

Correct the record

Every figure here traces to a state-published filing. If something is wrong, we want to fix it fast.

Candidates may submit a questionnaire response at any time; it is published verbatim beside the voting record.

Email corrections through the Elections page.