General election · 3 November 2026

State House, District 6

4 candidates on the ballot, listed in certified ballot order.

Race type
Contested
Candidates
4
Surveys returned
2 of 4
Race receipts
$28,143

Jerry Jongeling

Not a sitting legislator

RepublicanBallot order 1

Where they stand on data centers

Nothing on record.Jerry has never held legislative office, so there are no roll calls to score.

Survey: no response recorded

With no voting record and no returned questionnaire, this page has nothing from them on data centers. Voters have no stated position to weigh.

Ask them to answer

Money — a signal, never a position

$14,788Total itemized receipts
Matched a flag (A–D)

No itemized donors filed. That is not the same as having raised nothing.

Committee: Friends of Jerry Jongeling.

A flag means a donor matched a category. It is not a finding that anything improper happened.

The itemized ledger and the reported total disagree for this committee. Both figures are published; the larger is shown above.

How to reach them

Share this card

Elliott Neff

Not a sitting legislator

RepublicanBallot order 2

Where they stand on data centers

Nothing on record.Elliott has never held legislative office, so there are no roll calls to score.

Survey: no response recorded

With no voting record and no returned questionnaire, this page has nothing from them on data centers. Voters have no stated position to weigh.

Ask them to answer

Money — a signal, never a position

$12,249Total receipts reported
Matched a flag (A–D)

No itemized donors filed. That is not the same as having raised nothing.

Committee: Elliott Neff For State House.

A flag means a donor matched a category. It is not a finding that anything improper happened.

How to reach them

Share this card

Austin Wolf

Austin Wolf

Not a sitting legislator

DemocratBallot order 3

Where they stand on data centers

Nothing on record.Austin has never held legislative office, so there are no roll calls to score.

Survey: responded

Citizens aren’t against growth—but they are concerned about who benefits and who pays the cost. The biggest concerns I hear are around energy and water usage, strain on local infrastructure, and lack of transparency in how these projects are approved. Hyperscale data centers require massive amounts of electricity and cooling, which can put pressure on our grid and raise long-term costs for residents. There’s also concern about tax incentives. People want to know: are we giving away too much to attract these projects, while homeowners continue to face rising property taxes? Finally, there’s a trust issue. Decisions that impact entire communities are often made quickly, without clear communication or input from the people who live there. South Dakotans believe in growth—but we also believe in fairness, accountability, and making sure our communities aren’t left holding the bill.
We can support responsible growth and protect our communities—but it requires clear rules and transparency. First, we need full public disclosure of energy, water, and infrastructure impact before projects are approved. No surprises after the fact. Second, any tax incentives must come with accountability. If public dollars or tax breaks are involved, there should be clear benchmarks—job creation, local investment, and long-term community benefit. Third, we need to protect ratepayers. Large-scale users should carry their fair share of infrastructure costs so homeowners aren’t subsidizing corporate expansion through higher utility bills. And finally, local communities need a real voice. These decisions shouldn’t happen behind closed doors—they should involve the people they directly affect. Growth is coming to South Dakota. My job is to make sure it works for the people who already call this place home.
Published verbatim as submitted

Money — a signal, never a position

$1,106Total receipts reported
Matched a flag (A–D)

No itemized donors filed. That is not the same as having raised nothing.

Committee: Austin Wolf For District 6.

A flag means a donor matched a category. It is not a finding that anything improper happened.

How to reach them

Share this card

Garret M Campbell

Not a sitting legislator

DemocratBallot order 4

Where they stand on data centers

Nothing on record.Garret has never held legislative office, so there are no roll calls to score.

Survey: responded

The biggest concerns I get from the people of 6th district about the data center, just mostly focuses on how it will affect utility, & how the project wouldn't actually offer any noteworthy benefits for us. Hyperscale data centers are known to eat up electricity like bagged chips & drink up alot of water as a chaser right after. I already hear from the people of Harrisburg about how upset they are with their water bills, with it ranging from 100 to 300 for these people & now imagine how bad it would be having to compete with a singular building that demands more water than your whole town uses. Along with this people aren't really seeing how a data center like that would actually be helpful. Sure the city councils will just wave it off & point to other places & how "It brought them investments & jobs, so it should be good for us", then when you actually go to those places & talk to the people living with data centers nearby, they are upset by them. The biggest one in the country doesn't even employ 200 people, any jobs these places provide are nowhere near the costs they burden the actual people of the community they settle in. Simply put, these hyperscale data centers already ask for far too much from us, & offer far too little in return!
Part of my current platform already tackles utility costs as a part of lowering housing costs (IE solar panels on government buildings along with low to zero interest state loans to residents who want to put up solar or wind power on their land, along with a grant to upgrade water infrastructure). What we truly need, specifically for these hyperscale data centers, is an official referendum on a city to city level before one of these places goes up in them. The companies need to be able to come in with more than just a promise of 'prosperity & work'. They need to come in with actual proof of how they will negate or counteract the negative effects their center brings to the community. As well as the means & funds to actually fulfill what they are saying. Of course the city & or the state will need to verify it, & this information should also be available to the citizens, since data centers are kinda known for kicking in the door & rushing down there buildings with hastily written approval from councilors, just to get away with what they want before any backlash can stop them. Heck, just in the last election cycle we had that meat packing plant going up in Sioux Falls be one of the things the people could vote on, I see no reason why we can't force the same on these data centers. While a hyperscale data center may not be as smelly as a meat packing plant, it sure is louder than one, along with it's utility guzzling there is no doubt in my mind that they count as a building that would be within the public's interest to decide the fate of.
Published verbatim as submitted

Money — a signal, never a position

$0Total receipts reported
Matched a flag (A–D)

No itemized donors filed. That is not the same as having raised nothing.

Committee: Garret M Campbell For State House.

A flag means a donor matched a category. It is not a finding that anything improper happened.

How to reach them

Share this card

What the flags mean

A · Data center and Big Tech
The industry itself, its lobbyists, and the trade group that testified for the 50-year tax break.
B · Utility, power and energy
Utilities, generators, transmission and the ethanol bloc — interests whose revenue rises with data center load.
C · The PAC funnel
Money arriving through a political action committee rather than directly.
D · Named individuals
People named in the underlying investigation.
E and F · Outside money
Large national spending and independent expenditure made for a candidate. Never the candidate’s own money, and never added to their receipts.

How the score is built

Roll calls on 2026 data center bills are tracked. A vote counts as protective when it sided with residents on cost, water, or local control.

Candidates with no legislative service have no score. That is shown as an absence, never as a zero.

Full roll calls and bill text: the legislative scorecard.

Correct the record

Every figure here traces to a state-published filing. If something is wrong, we want to fix it fast.

Candidates may submit a questionnaire response at any time; it is published verbatim beside the voting record.

Email corrections through the Elections page.